Week 18 (August 31 – September 4)

This week was mostly more meetings about how the QA process will work. As well as design meetings for what else needs to be added before production. I also learned about another part of the application known as insight. Basically after all the building and analyzing and calculating and saving to the database is done for TPS reporting, the insight application should take the data from the TPS database and import it into a separate Insight database. From here  several other processes and reports are generated but I don’t quite understand the process yet. It was definitely surprising to me however considering we’re one week away from QA and I’ve never heard of this application. Apparently our team already laid most of the ground work for it so that’s good; but there is still plenty of work to be done on this thing before we can go into production